Oregon Overtime Calculator

July 1, 2026 to June 30, 2027: $15.55 standard; $16.80 Portland metro (inside the urban growth boundary); $14.55 non-urban counties. 1.5 times the regular rate for hours over 40 in a workweek. Manufacturing establishments and nonfarm canneries, driers and packing plants also owe overtime after 10 hours a day; pay whichever of daily or weekly overtime is greater.

Enter your work punches

Weekly totals

Replace the sample punches with your own. Blank days count as zero.

Use 9:00am, 17:00 or 1700. Breaks are unpaid minutes; leave zero for a break already punched out.

Jump to results
40:00 worked · 40.00 decimal hoursTotals update as you type.
Enter work punches and break minutes by day
DayIn / out punchesBreakWorkedRegularOT / DT
Sun, 11/1
8:00
8.00 h
8:00
8.00 h
0:00 / 0:00
0.00 / 0.00 h
Mon, 11/2
8:00
8.00 h
8:00
8.00 h
0:00 / 0:00
0.00 / 0.00 h
Tue, 11/3
8:00
8.00 h
8:00
8.00 h
0:00 / 0:00
0.00 / 0.00 h
Wed, 11/4
8:00
8.00 h
8:00
8.00 h
0:00 / 0:00
0.00 / 0.00 h
Thu, 11/5
8:00
8.00 h
8:00
8.00 h
0:00 / 0:00
0.00 / 0.00 h
Fri, 11/6
0:00
0.00 h
0:00
0.00 h
0:00 / 0:00
0.00 / 0.00 h
Sat, 11/7
0:00
0.00 h
0:00
0.00 h
0:00 / 0:00
0.00 / 0.00 h
Regular40:0040.00 h
Overtime · 1.5×0:000.00 h
Double time · 2×0:000.00 h
Estimated gross—rate × allocated hours

Estimate only; not legal, tax or payroll advice. Verify your workweek and overtime rule before using these results.

Times such as 915, 9.15am, 9:15 PM, and 21:15 work. A shift ending earlier than it starts is treated as overnight. Shifts belong to the day they start.

Last updated: · Estimates only; not legal, tax or payroll advice. View sources and limitations.

How to use this calculator

  1. Enter your Oregon workweek and actual punches, deducting unpaid breaks once.
  2. Enter your hourly rate and keep Federal selected to estimate overtime after 40 hours in a workweek.
  3. Review the state rules and calculator limits below alongside your results.

Formula

The Federal preset calculates regular hours = min(workweek hours, 40) and overtime hours = max(workweek hours − 40, 0). Estimated gross pay = regular hours × rate + overtime hours × rate × 1.5.

Worked examples

Oregon: 4 shifts at $24

Schedule: 9:54 + 9:54 + 9:54 + 9:54 of net worked time. The engine calculates 39:36 (39.60 hours).

Regular: 39:36 (39.60 h); overtime: 0:00 (0.00 h); double time: 0:00 (0.00 h). At $24.00 per hour, estimated gross pay is $950.40.

Oregon: five longer shifts at $58

Schedule: 10:08 + 10:08 + 10:08 + 10:08 + 10:08 of net worked time. The engine calculates 50:40 (50.67 hours).

Regular: 40:00 (40.00 h); overtime: 10:40 (10.67 h); double time: 0:00 (0.00 h). At $58.00 per hour, estimated gross pay is $3,248.00.

Oregon minimum wage

July 1, 2026 to June 30, 2027: $15.55 standard; $16.80 Portland metro (inside the urban growth boundary); $14.55 non-urban counties.

Oregon overtime rule

1.5 times the regular rate for hours over 40 in a workweek. Manufacturing establishments and nonfarm canneries, driers and packing plants also owe overtime after 10 hours a day; pay whichever of daily or weekly overtime is greater.

Oregon wage and coverage note 1

Tip credits are not allowed in Oregon.

Calculator scope

This page starts with the Federal preset and one entered hourly rate. The 10-hour daily rule for manufacturing and canneries is not modeled.

Frequently asked questions

What is the minimum wage in Oregon?

July 1, 2026 to June 30, 2027: $15.55 standard; $16.80 Portland metro (inside the urban growth boundary); $14.55 non-urban counties.

What overtime rule applies in Oregon?

1.5 times the regular rate for hours over 40 in a workweek. Manufacturing establishments and nonfarm canneries, driers and packing plants also owe overtime after 10 hours a day; pay whichever of daily or weekly overtime is greater.

What wage and coverage details matter in Oregon?

Tip credits are not allowed in Oregon.

What does this calculator cover?

The Federal preset estimates overtime after 40 hours in a workweek using one entered hourly rate. The 10-hour daily rule for manufacturing and canneries is not modeled.

Sources

Sources checked

Related state calculators

Related tools